PREPARING EXISTING BUILDINGS FOR THEIR NEXT USE
Shell & Core Works
We carry out shell and core works to prepare existing buildings for refurbishment, redevelopment or fit out. Our work can include altering the structure to suit a new layout, forming openings for access and building services, and preparing floors and walls for new finishes. We coordinate these works with the design team and the contractors who will take over each area, so everyone knows what needs to be ready at handover.
STRUCTURAL ALTERATIONS AND COORDINATION
Adapt the building to suit the new layout
We work with structural engineers and the wider design team to establish how the proposed layout fits within the existing building. This includes reviewing which elements to retain, where new openings are needed, and how the alterations affect other trades.
Where the design calls for temporary support or enabling works, we build those requirements into the programme so they are in place before the relevant alterations begin.

BUILDERS’ WORKS AND MAKING GOOD
Prepare floors and walls for the next trade
We agree the condition each area needs to be in at handover, taking account of the services, installations and finishes that will follow. That might mean making good around a newly formed opening, repairing surfaces disturbed by structural alterations or preparing an existing floor for a new finish. We coordinate the work with the trades taking over each area so they can plan their installations around a clear scope and handover date.



