The project is just off Clerkenwell Road— a three-storey industrial building with a rooftop timber decked area complete with shallow pond.

Before the demolition works began, Tower conducted and supplied to the client a full condition survey of the property and surrounding landscaping and hard standing areas.

Tower was responsible for the disconnection, isolation, draining down and safe removal from site of all the existing mechanical, electrical, roof plant and public health services within the building. We also had to salvage, transport & store a piece of artwork for Amnesty International, who were the previous tenants.

We undertook the strip-out, working to the specification compiled by Ibbotson Architects for Jackson Coles LLP. Tower supplied and installed 110v temporary lighting, with emergency light fittings, throughout the building to provide and maintain a safe working environment throughout the contract period and beyond.

All plant from the plant room was removed using cold cutting techniques to reduce the risk of fire and transported to the ground floor using the existing lifts, which were then cut out to complete the strip out works.

Tower Demolition completed the project on program and the only variations were opening up works requested by the client.

Disclaimer: The above projects were conducted by Tower under the direction of James Bibbey and John Egan joint managing directors of Tower Demolition (Holdings) Ltd, formerly Tower Demolition and Enabling Ltd, formerly Tower Demolition (Holdings) ltd, formerly Tower Demolition Ltd, this project was not conducted by BibbEgan Demolition and Strip Out ltd nor BibbEgan Group ltd or any of its subsidiaries.

Project Details

CLIENT

Jackson Coles LLP

PROJECT TYPE

Commercial

DURATION

13 Weeks

PROJECT VALUE

£210,000

TYPES OF WORK
  • Full Conditional Survey

  • Services Isolations

  • Installation of Temporary Supplies

  • Soft Strip

  • Plaster Removal

  • Sandblasting to Brick Walls

  • Plant Room Removal

  • Trial Hole & Opening-Up Works

  • CCTV Drainage Survey