The Colonnades Shopping Centre, London W2

Originally constructed in circa 1972 the development involved the demolition of existing retail and office areas to create a new enlarged retail space at both ground and first floor level with the car park being reconfigured within the basement. Works Associated with this project included; new goods and passenger lifts including lift shafts, floor openings along with associated basement foundations and pit works Installation of New Escalators including pits and openings, infilling redundant vent shafts, replacement of existing car-park vent system, strip out of old/damaged car park Armco barriers, and some redundant fixtures and fittings, formation of openings, full internal strip out of existing 1st floor office spaces back to existing structure, full strip out of existing ground floor retail spaces including live phase Waitrose store back to existing structure.

The first phase of demolition was to strip out and remove redundant M&E within the basement car park, including the removal of the designated storage rooms, plant and block-work walls.

Throughout the project and duration of the demolition through to its completion, different parts of the premises remained occupied or trading with existing tenants or residents.

Basement
50 car parking spaces for The Colonnades centre vehicles to remain available @ all times

Ground floor
The Waitrose store remained trading throughout, along with the Estate Agents located at the east end of Porchester Walk.

2nd floor
Residents remained in occupancy throughout the projects duration and access to fire escapes was maintained at all times.

Rear service yard
Remained in operation at all times for Waitrose deliveries, the public house deliveries and access for Council waste collection vehicles daily.

This project was extremely sensitive and delivered with great care to the local inhabitants and environment.

Disclaimer: The above projects were conducted by Tower under the direction of James Bibbey and John Egan joint managing directors of Tower Demolition (Holdings) Ltd, formerly Tower Demolition and Enabling Ltd, formerly Tower Demolition (Holdings) ltd, formerly Tower Demolition Ltd, this project was not conducted by BibbEgan Demolition and Strip Out ltd nor BibbEgan Group ltd or any of its subsidiaries.

Project Details

CLIENT

Midas Retail Limited

PROJECT TYPE

Commercial

DURATION

20 Weeks in two phases

PROJECT VALUE

£180,000

TYPES OF WORK
  • Refurbishment & Demolition Survey

  • Scaffolding

  • Asbestos removal

  • Soft Strip

  • Removal of 3 Lifts

  • Lift Pit Excavations

  • Plant Room Removal

  • Facade Removal

  • Glass Curtain Wall Removal

  • Screed Removal

  • Live Environment

  • Services Disconnections

  • 97% Recycled