Project Particulars
Client:
Tower 42 Limited Partnership
Principal Contractor:
BibbEgan Group
Project Value:
£1,400,000
Duration:
38 Weeks
We undertook a complex demolition and enabling works package at 20 Old Broad Street for Tower 42 Limited Partnership, preparing the building for redevelopment as a new hotel within a busy City of London location.
Detailed planning included structural investigations, condition surveys, hazardous material surveys, asbestos removal and coordination with key stakeholders. We liaised with the City of London Club and Tower 42 to plan the works around neighbouring properties and ongoing operations.
Engineered temporary works maintained structural stability throughout the project, including back propping, temporary supports and protection measures. Site mobilisation included the installation of hoarding, access scaffolding, a platform hoist, welfare facilities and temporary services.
Before demolition began, we completed service isolations, draining down and decommissioning. Enabling works included soft strip out and the removal of redundant plant and equipment, preparing the structure for the next phase.
The demolition package included the controlled removal of floors, roof structures, basements, stair cores and structural elements. Careful sequencing and specialist demolition techniques supported safe delivery within the constrained city centre site.