CASE STUDY

56-62 King’s Road

Project Particulars

Client:

Cadogan Estates / Arcadis

Principal Contractor:

B.E.T Enabling

Project Value:

£250,000

Duration:

9 Weeks

Project details

B.E.T. Enabling, part of BibbEgan, was appointed by Cadogan Estates to complete a full strip-out and asbestos removal at 60 to 62 King’s Road, together with the ground floor to Level 3 at 56 to 58 King’s Road.

We began once vacant possession had been confirmed for all affected units, installing hoarding in accordance with Cadogan’s requirements to protect the public and our site teams. We tagged and traced mechanical, electrical, and plumbing services to ensure neighbouring retail units could continue operating throughout the project. We then completed refurbishment and demolition surveys, along with hazardous materials surveys, to identify asbestos and allow its safe removal.

Following completion of the surveys, we commenced strip-out works at 60 to 62 King’s Road, progressing from the ground floor through to Level 3 and the roof space.

With commercial and residential properties close to the site, we followed a detailed traffic management plan throughout the works. Site access via Blacklands Terrace helped minimise disruption along King’s Road.

We completed the project on time and within budget for Cadogan Estates.

Scope of works

  • Refurbishment and demolition survey
  • Asbestos survey
  • Asbestos removal
  • Strip out
  • Removal of existing lift shafts
  • Exploratory investigations
  • Hoarding
  • Trial pit in basement
  • Installation of temporary services and alarm system