CASE STUDY

Lancer Square, Kensington

Project Particulars

Client:

Chesington Investments Ltd

Principal Contractor:

Bibbegan Demolition

Project Value:

£3,500,000

Duration:

32 Weeks

Project details

We delivered the demolition and enabling works at Lancer Square for Chesington Investments Ltd. The approximately 4,000 m² site in Kensington comprised two commercial buildings arranged around a central courtyard, with retail units at ground level. The four and five storey buildings featured reinforced concrete frames, brick façades and a single basement extending 4.5 metres below ground.

Our works included service disconnections, tree protection, asbestos removal, soft strip and full demolition down to the underside of the ground bearing slabs, together with foundation removal.

Temporary structural supports were designed and installed to the main building’s basement retaining wall, enabling the ground slab to be removed safely. We then backfilled the basement with 6F2 recycled aggregate and constructed a piling mat across the remaining site footprint.

Demolition materials were crushed on site for reuse as backfill and piling mat material. This approach reduced vehicle movements to and from the site by approximately 600 journeys.

With residential and commercial properties surrounding the site and Kensington Palace adjacent to the rear, close coordination with neighbours and the Royal Borough of Kensington and Chelsea was essential. Before works began, we agreed environmental controls and working hours and addressed planning requirements.

Real time noise and dust monitoring provided accessible monitoring data, with automated text and email alerts sent to the local authority and our site team. We used low noise demolition techniques to minimise disruption to surrounding occupiers.

Waste was segregated at source and managed through a Site Waste Management Plan, with 95% of project arisings recycled.

Video

Scope of works

  • 45,000 m² soft strip out
  • Asbestos removal
  • Service isolations and temporary services
  • Site hoarding and graphics
  • New goods lift and lift pit
  • Slab removal
  • New service risers
  • Wireless fire alarm system
  • Below ground drainage
  • Fire protection works
  • Builders’ work in connection
  • 100% recycling

Related case studies