BibbEgan delivered a comprehensive strip out and asbestos removal project for IKEA at 214 Oxford Street, the Grade II listed former flagship Topshop store at Oxford Circus. The building comprised approximately 18,000m² across seven floors above ground and two basement levels.

A central challenge was identifying and tracing existing services, for which no records, diagrams or plans were available. We needed to isolate services supplying the work areas while keeping the ground floor Nike and Vans stores fully operational.

Working closely with project managers Avison Young and incumbent fire alarm contractor Siemens, we carried out investigations outside normal trading hours to identify and tag essential supplies. This allowed us to disconnect and remove redundant services while maintaining operations within the occupied retail units.

Once services had been isolated, we stripped out multiple layers of shop fittings and finishes accumulated over decades. These concealed considerably more waste than originally anticipated, with over 500 loads of material removed in 40 cubic yard skips through the loading bay on Great Castle Street.

Additional asbestos discovered during the works required adjustments to our sequence and programme. Careful coordination allowed us to manage these discoveries alongside the wider strip out, screed removal and plant removal works.

A comprehensive pedestrian and traffic management system controlled approximately 1,000 vehicle movements while accommodating daily deliveries to Nike and Vans. Through on site segregation and recycling, we achieved a recycling rate of 99%.

Scope of works

  • Refurbishment and demolition survey
  • Works within a Grade II listed building
  • Liaison with The Crown Estate
  • Asbestos removal
  • Service disconnections
  • Installation of temporary services
  • Tracing and identification of services supplying occupied areas
  • Soft strip
  • Screed removal
  • Plant removal
  • On site waste segregation and recycling
  • 99% recycling rate