Project details

We delivered an extensive asbestos removal and strip out project at Bonham Carter House and Warwickshire House for the University of London, working with CPC Project Services.

Early asbestos surveys targeted previously inaccessible areas to establish the full extent of asbestos within the buildings. While these investigations progressed, we isolated incoming services, installed temporary services throughout the buildings and introduced a wireless fire alarm system.

To manage waste removal within the constrained location, parking bays were suspended on Malet Street and a substantial scaffold loading gantry was designed and installed. This enabled efficient loading of 40 cubic yard waste containers while controlling dust.

Heritage areas and listed elements required careful protection throughout the works. We planned movement through the buildings around these sensitive features, maintaining protection while progressing the strip out.

Soft and hard strip works proceeded from roof level downwards, with waste transferred vertically through chutes to the first floor loading gantry. We also demolished the squash court using small plant, bringing the resulting materials up to the gantry for removal.

Significant quantities of parquet flooring were salvaged for reuse, returning valuable materials to the circular economy. All waste excluding asbestos was recycled or reused on site.

We completed the project within the original programme and budget.

Scope of works

  • Refurbishment and demolition asbestos survey
  • Protection of listed building elements
  • Wireless fire alarm system
  • Service isolations and temporary services
  • Extensive asbestos removal
  • Scaffold loading gantry
  • Soft and hard strip out
  • Lift removal
  • Squash court demolition
  • Protection of heritage areas and retained lifts