We undertook a sensitive city centre project at the former Debenhams store at 1 to 12 Magdalen Street, Oxford, for The Crown Estate. Works included architectural and MEP strip out, service validation, lift and escalator removal, and the design and installation of emergency lighting, L1 fire alarm and standby generator systems.

A detailed project execution plan was agreed with the client, including engagement with neighbouring tenants to plan the works around surrounding shops and businesses. With heavy traffic on Magdalen Street, we established access at the rear of the building via Red Lion Square, accommodating site offices, welfare facilities and a reinstated loading bay for waste removal.

Roof plant removal required carefully coordinated crane lifts. These were planned with Oxford City Council and completed during a weekend road closure to minimise traffic disruption while maintaining safe access to the busy shopping areas.

Comprehensive MEP validation surveys traced, tagged and identified services serving both the former Debenhams premises and other building occupiers. This enabled redundant services to be removed safely while retaining essential supplies to occupied units. The client also received a detailed report identifying the remaining live service infrastructure.

A comprehensive standby generator system was installed to maintain sprinkler and building life safety systems in the event of a power outage.

Scope of works

  • Soft strip
  • MEP strip out
  • Service retention to occupied units
  • Asbestos surveys
  • MEP validation surveys
  • Escalator removal
  • Lift removal
  • Scaffolding and temporary works
  • Roof plant removal
  • Craneage works
  • Façade remedial works
  • Wireless L1 fire alarm system
  • Emergency lighting systems