CASE STUDY

Marks & Spencer, Cabot Circus, Bristol

Project Particulars

Client:

Marks & Spencer

Principal Contractor:

B.E.T. Enabling

Project Value:

£4,600,000

Duration:

20 Weeks

Project details

We delivered a substantial enabling works and structural alteration project directly for Marks & Spencer at Cabot Circus in Bristol. Working within an operational shopping centre, we prepared the premises to meet the retailer’s requirements while maintaining separation from surrounding shops and public areas.

We first established a secure working area using hoarding with one hour fire resistance and Firefly fire barriers. Marks & Spencer branded graphics were applied to the hoarding and windows.

Before removing any services, we completed detailed tracing and identification to distinguish supplies serving our working areas from those supporting the wider shopping centre. This enabled redundant services to be removed while retaining essential supplies to occupied areas.

Our strip out covered 25,000 m² and included raised access flooring and screed removal. We then undertook extensive enabling works and structural alterations, including constructing a new lift shaft and extending an existing shaft.

The wider package included over 10,000 m² of new screed, substantial below ground drainage, fire protection to existing steelwork, slab infills and new service risers.

To meet the demanding programme, we worked around the clock for eight weeks within the overall project period. The works were delivered without complaints from centre management, neighbouring stores, shoppers or nearby residents.

Scope of works

  • 25,000 m² soft strip out
  • Screed removal
  • Site hoarding and graphics
  • New goods lift and lift pit
  • Slab infills
  • New service risers
  • New screed installation
  • Below ground drainage
  • Fire protection works
  • Builders’ work in connection
  • 100% recycling

Related case studies