CASE STUDY

Marks & Spencer, Chiswick

Project Particulars

Client:

Marks & Spencer

Principal Contractor:

BibbEgan Group

Project Value:

£4,500,000

Duration:

33 Weeks

Project details

We combined four retail units on Chiswick’s busy high street to create an extended Marks & Spencer Foodhall. The project involved extensive strip out, demolition and structural alterations, with tenants occupying the buildings above.

Early works included site hoarding, temporary services and site investigations, followed by a complete architectural and M&E strip out. We also undertook asbestos surveys and licensed asbestos removal.

To create a single ground floor retail space, we designed and installed a complex temporary propping system to support the buildings while internal supporting walls were demolished. Permanent structural works included the design and installation of 90 tonnes of structural steel picture frames with reinforced concrete foundations.

Restricted access required the use of small plant and limited lifting equipment, together with substantial fabrication on site.

Following removal of the temporary propping, we installed new drainage and laid reinforced concrete floor slabs and high strength floor screeds throughout. New roof coverings were installed across all buildings, alongside gypsum and intumescent fire protection, security doors and fire rated door sets.

We worked 24 hours a day, seven days a week to meet the client’s programme requirements, achieving a Considerate Constructors score of 45 out of 45.

Scope of works

  • Site hoarding and graphics
  • Site investigations
  • Asbestos surveys
  • Asbestos removal
  • Point cloud surveys
  • Soft strip out
  • Demolition
  • Temporary propping
  • Structural alterations
  • Structural steelwork
  • Fire protection
  • Roof coverings
  • Concrete works
  • Floor screeds